News
Archive for March, 2010
Stevens Construction, Inc. recently started construction on the Gorovoy Cornea Laser Center in Fort Myers. It is scheduled for completion in the fall.
Located at 12453 South Cleveland Avenue, the facility will include the addition of a 4,600sf ambulatory surgery center to an existing two-story facility. When completed, the center will encompass 10,580sf and include two operating rooms, recovery rooms, step-down recovery rooms, consultation areas, a patient lounge and administrative offices.
When completed, the Gorovoy Cornea Laser Center will be an Agency for Healthcare Administration (AHCA) licensed facility, which ensures regulatory compliance for healthcare facilities throughout Florida.
Project was designed by Christopher Lee of Christopher J. Lee Architects, Inc.
Stevens Construction To Build Vision Center, Renovate Cape Church
Dr. Michael S. Collins has awarded Stevens Construction, Inc., the contract to build the 10,440sf Vision Center at 6900 International Blvd. in Fort Myers.
Designed by Christopher J. Lee Architects, Inc., the medical office will feature eight exam rooms, a procedure room, two orbital scan rooms, lobby, reception area, staff lounge, an eyewear retail area and administrative offices. Construction is scheduled to begin this spring, with the completion before the end of the year.
Also poised to commence is Stevens Construction’s renovation of the Cape Coral First United Methodist Church at 4118 Coronado Parkway.
Construction of the activity center will include the remodel and addition of the 6,920sf activity center to total a 13,377sf, two-story building upon completion. The enhanced children’s ministry will include a preschool, multi-purpose room, classrooms, kitchen and associated services.
Christopher J. Lee Architects, Inc. is the project architect.
Based in Fort Myers, Stevens Construction provides construction management, general contracting and consulting services to commercial clients and design professionals. The company has built health care, commercial and hospitality facilities in Southwest Florida and statewide. For more information, visit www.stevensconstructioninc.com or call (239) 936-9006.
Search News Posts
Latest News Posts
- Orthopedic Surgery Center Construction Started
- WPTK Radio Transmission Facilities Construction Completed
- Christopher J. Lee Architects Wins Five Awards at 2011 Lee BIA Summit Awards
- Christopher J. Lee Architects Wins First Place in Commercial Division – Favorite Buildings in SWFL
- Christopher J. Lee Architects wins 2011 Aurora Awards
Categories
- Architecture Articles (2)
- Awards (5)
- Cape Coral (2)
- Completed Construction (1)
- Fort Myers (9)
- Lee County (4)
- Lehigh (1)
- National Association of Home Builders (NAHB) (1)
- U.S. Green Building Council’s LEED (1)
- Uncategorized (4)
Archives